Our item range includes all varieties of helical gear, spur gear, bevel gear, equipment rack, worm gear, sprockets,chains, bearings. Keeping in head that excellent service is the important to cooperating with customers, we strive to fulfill higher quality requirements, offer aggressive rates and make certain prompt delivery. High quality and credit score are the bases that make a company alive.
HangEPT DELE DF Guide Hand EPT 2Ton EPTT EPT EPTT EPT Block
EPT EPTT CE Certification EPTT Hand Block
one:suspension and load hooks are manufactured of antiading alloy steel,high energy deformation happens when the cse will be first celebration of overload with out unexpected fracture.
two.all spart use substantial high quality materials make.and prepare coating ,can excellent be anticorrosive.
3.strong the metal cover and plate excellent to safeguard inside spart construction.
4.roller and EPT composition all have include to good shield,can use in every where.
five.load wheel use great materials and producten precision,very good for use load EPT accuracy.
6.hook with security latch securely can roate freely 360degrees .ergonomic handle style engineering so that the hoist is effortless to run.
7:closed design guards the internal parts from contamination.
eight.all areas of the load disc brakes come on by the high good quality metal and anti corrosion.
EPTnical details | |||||||
Product | HSH | DF-B500 | DF-B500 | DF-B1000 | DF-B2000 | DF-3000 | DF-50000 |
Potential load | (kg) | 5000kg | 5000kg | 10000kg | 20000kg | 30000kg | 50000kg |
StXiHu (West EPT) Dis.Hu (West EPT) Dis.rd elevate | (m) | 3 | three | 3 | 3 | three | three |
Load EPT Amount of falls | one | two | 3 | eight | twelve | 12 | |
Power | (N) | 370 | 370 | 380 | 380 | 400 | 390 |
Working testload | (kg) | 7500 | 7500 | 15000 | 30000 | 45000 | 75000 |
Load EPT diameter timesNumber of falls | (mm) | 11.2*31 | 10*30 | 10*thirty | 10*thirty | 10*thirty | eleven.two*31 |
Hang EPT diameter timesNumber of falls | (mm) | 5*twenty five | five*25 | 5*twenty five | 5*25 | five*twenty five | five*25 |
Web weight | (kg) | 37 | forty | seventy three | 176 | 258 | 425 |
EPTT excess weight | (kg/m) | 38.5 | 40.6 | 73.6 | 200 | 285 | 465 |
EPTT dimensions | (cm) | 44*24*26 | 58*forty six.five*24.five | ||||
include 1m load EPT N.W | (kg) | two.5 | four.four | 6.six | seventeen.six | 26.4 | 30 |
add 1m hand EPT N.W | (kg) | .nine | .9 | .9 | 1.8 | 1.eight | 1.eight |
Dimensions(mm) | a | 260 | 216 | 244 | 429 | 533 | 570 |
b | sixty five | sixty five | 70 | 125 | one hundred fifty | a hundred ninety | |
c | 248 | 204 | 204 | one zero five | one hundred and five | a hundred twenty five | |
d | fifty one | fifty four | 376 | 373 | 445 | ||
e | 184 | 167 | 167 | 222 | 220 | 279 | |
f | ninety six | eighty three | 83 | 113 | 109 | one hundred forty | |
Hmin | 576 | 660 | 705 | 1100 | 1139 | 15000 |
Payment
Payment time period | L/C | l/c quantity over 40.000 usd,we can settle for L/C at sight | |
T/T |
EXW | 30% T/T in EPT,compensated the stability ahead of shipment | |
FOB | |||
CIF | thirty% T/T in EPT,paid the equilibrium in opposition to copy of B/L | ||
cfr(c ampf) | |||
paypal | quantity reduce than 4000usd | ||
west |
Shipping time | fifteen~35daEPTTafter receiving payment for one particular container |
We welcome use trade assurance,you`ll enEPTT: a hundred% solution high quality security 100% on-time shipment defense 100% payment defense for your coated volume |
Wecome to EPTT firm, Speak to element underneath:
Make contact with : Miss Angela XiHu (West EPT) Dis.Hu (West EPT) Dis.
Site: